Wastewater fees 2025: All information about the upcoming billing!
The 2025 wastewater fees in Sinzing will be billed at the beginning of March 2026. Current information and fees can be found online.
Wastewater fees 2025: All information about the upcoming billing!
The billing of wastewater fees for 2025 in the municipality of Sinzing is imminent. As the municipality of Sinzing informs on its website sinzing.de, the bills are expected to be prepared in the first week of March 2026. These statements are printed by the IT provider and then sent via the municipality.
It is important to note that no individual invoices are created before bulk processing. The municipality therefore asks that you refrain from inquiring about the processing status or the dispatch date of the billing notices. For current information on shipping dates, citizens can consult the news overview on the Sinzing municipality homepage.
Fee rates remain unchanged for 2025
The fee rates for wastewater fees will remain unchanged in 2025 compared to the previous year. The fees are set as follows:
| fairy | amount |
|---|---|
| Dirty water fee per m³ of fresh water consumption | 2.06 euros |
| Rainwater fee per m² of built-up and paved area | 0.28 euros |
| Basic fee for dirty water (water meter) | |
| Water meter with nominal flow rate up to 2.5 m³/h | 63.00 euros |
| Water meter with nominal flow rate up to 6 m³/h | 81.00 euros |
| Water meter with nominal flow rate up to 10 m³/h | 125.00 euros |
| Water meter with nominal flow over 10 m³/h | 188.00 euros |
Households that require the annual amounts in advance have the option of self-calculation. However, it remains to be seen how many citizens will take advantage of this option.
The upcoming billing is a further step towards transparent cost distribution and enables citizens to prepare for stable fees. The municipality of Sinzing will continue to provide information about current developments and important information about billing on its website.