Sewer fees for 2025: Important information about the final billing in Bernhardswald!
Important information about the final sewer fee billing for 2025 in Bernhardswald: deadlines, reading cards and self-reading explained.
Sewer fees for 2025: Important information about the final billing in Bernhardswald!
The municipality of Bernhardswald is preparing for the final billing of the sewer fees for 2025. This settlement will take place at the end of the year and citizens are asked for their help. It is particularly important that the handling of reading cards and meter reading data can be regulated differently depending on the district and the associated water association (WZV). Detailed information on this can be found in the newsletter for October-November 2025, such as bernhardswald.de reported.
A significant part of the billing concerns the reading of the water meters, which this year will again be carried out as self-reading. Every customer will receive a self-reading card in the mail, which they must return by October 31st. It is also possible to use the online form to submit consumption. Reading cards for customers with garden and water meter shafts will be sent out from September, while cards for other collection points are not expected until the end of November. The reading procedure stipulates that the meter reading is only transmitted in one way; Multiple reports will not be taken into account. The reading cards are sent free of charge, the postage is borne by the ZWAV, as the information on zwav.de confirm.
Correct billing ensured
In order to ensure correct billing, it is very important to return the self-reading cards on time or provide the correct meter reading online. Customers will receive their annual bill for drinking water, wastewater and rainwater by the end of January and can make corrections in justified cases from the end of January. However, prior inquiries about the meter readings are not possible.
The sewer fees are part of the operating costs that landlords can bill in accordance with the Operating Costs Ordinance (BetrKV). This includes the costs for drainage, fees for house and property drainage as well as the operating and cleaning costs of non-public systems, including the drainage pump. Other relevant costs that the landlord may bill are rainwater fees and the fees for using their own wastewater system, while connection fees and costs for pipe blockages do not have to be billed deutschesmietrecht.de thematised.
Dirty water fees are calculated based on fresh water consumption, meaning there is no direct water meter on the sewer line. This is done indirectly through the meter on the house water connection. It is also permissible to bill the costs for fresh water and dirty water together if the allocation is based on fresh water consumption. In the case of rainwater drainage, however, the bills would have to be based solely on the area and should not depend on the tenants' consumption.